4-Room Apartment without WBS
4-Room Apartment without WBS
Bemerode, Hannover
€ 1,330
Description
Property reference: 1.589.210
Beautiful 4-room apartment in a multi-family house with elevator
The advance payment for operating costs includes 65.66 € water costs. // New building // Apartment is barrier-free // Elevator // Underfloor heating with hot water supply (energy source: gas) // Basement room // high-quality PVC planks in wood look // modern media supply (fiber optic cable) // Balcony/terrace/loggia // partly open living/dining area/kitchenette, partly separate kitchen: tiled backsplash, electric stove connection // bathtub and shower bathroom, walk-in shower, floor tiles, wall tiles, washing machine connection, shower with glass partition // intercom system // bicycle cellar
Kronsrode offers urban living in greenery, in direct neighborhood to Expo Park. On 53 hectares, a total of 3,500 residential units are being developed in this new district. In addition to apartments, city maisonettes with their own entrance and townhouses are being built here, these are three-story townhouses, of which hanova will realize six. At the end of May 2019, the winning designs of the announced architectural competition were presented. Schools, kindergartens, shopping facilities and public transport such as the Messe/Ost and Stockholmer-Allee light rail stations are within walking distance. Spacious parks run through the quarter. The transport connection is ideal. Via the Messe expressway, you can reach the city in a very short time and just as quickly the A2 and A7 motorways // hanova is active in Kronsrode-Mitte in cooperation with the concentrated Hanover housing industry. By the end of 2023, the company is building around 300 apartments, a daycare center and some commercial units on three defined construction sites (construction site 1.1, 7 & 10) in Lower Saxony's largest new development area. About a quarter of the apartments will be publicly subsidized to offer affordable housing. Other Hanover actors are Delta Bau AG, Gundlach, KSG Hannover, meravis and the Spar- und Bauverein.
NOTE ON APPLICATION:
To provide you with the best possible service, you can apply digitally with us. Copy the link below into your browser's address bar and follow the instructions.
https://tenant.immomio.com/apply/4de8f1b3-cd73-4466-b456-d877a1625cbb
Details
Features
- Balcony or terrace
- Cellar
- Lift
- Step-free access
How we arrange this apartment for you
We are a letting agency, and this is an apartment we can secure for you. One message is enough to start. It costs nothing and commits you to nothing.
An adviser approaches the owner or the managing agent on your behalf, arranges and attends the viewing, and negotiates the terms. We then prepare the tenancy agreement, check it line by line and explain it to you in your own language.
We also assemble the documents a German landlord expects before an apartment is held for anyone: proof of income, Schufa report, confirmation of no rent arrears, tenant self-disclosure, the deposit. You do not deal with any of it alone.
We stay with it until the contract is signed and the keys are in your hand.
Location
The map shows where this apartment is. Where the exact house number has not been published we show the centre of the postcode instead, and say so.
Rosalind-Franklin-Allee 56, 30539 Hannover, Bemerode
We help you get this apartment
Leave your details and one of our advisers will contact you shortly. We take it from there: the owner, the viewing, the contract and the paperwork.