Available Immediately, WBS Required for 56m²!
Available Immediately, WBS Required for 56m²!
Bad Driburg
€ 286
Description
In Bad Driburg, a friendly 2-room apartment on an upper floor is available for rent. The apartment is located on the 2nd floor of a building constructed in 1978 and offers a living area of 57 m². The bathroom has natural daylight and is equipped with a bathtub, providing pleasant lighting conditions. The kitchen is rented unfurnished, allowing space for your own design. Laminate flooring ensures a modern and easy-to-maintain atmosphere. The apartment is heated with gas. Particularly attractive is the location in the pedestrian zone, guaranteeing short distances and a pleasant environment.
Are you interested? Then send the property ID 217-6-M via WhatsApp to 0211 740 70 99 90, via Signal to 0172 8877030, or via Threema to *LEGCHAT.
Important note: After you have filled out and submitted the contact form on the portal, you will receive an email from us within 15 minutes.
Please follow the link provided there to confirm your email address and your details.
• Balcony
• Smoke detector
• Energy certificate available
• Bathroom with natural daylight
• Tenant cellar
• Thermal insulation
• Laundry room cellar
• Elevator
• Bathroom with natural daylight and bathtub
• Guest WC
• Laminate flooring
• Insulated glazing
• Central
• Gas
• Shopping facilities reachable within a few minutes
• Pedestrian zone right outside the door
• Primary school about 20 minutes on foot
• Kindergarten within walking distance
• Public transport stop in immediate vicinity
• Fitness studio at the door
• Thermal bath and spa garden quickly reachable
Would you like to schedule a viewing? We look forward to seeing you!
We at LEG are your competent landlords with many decades of experience in the housing industry.
We are happy to advise you on the deposit as installment payments. In addition, you can provide a deposit guarantee via plusForta. Just talk to us!
This offer is non-binding. Errors excepted. The floor plan is not to scale.
Details
Features
- Balcony or terrace
- Cellar
- Parking space
How we arrange this apartment for you
We are a letting agency, and this is an apartment we can secure for you. One message is enough to start. It costs nothing and commits you to nothing.
An adviser approaches the owner or the managing agent on your behalf, arranges and attends the viewing, and negotiates the terms. We then prepare the tenancy agreement, check it line by line and explain it to you in your own language.
We also assemble the documents a German landlord expects before an apartment is held for anyone: proof of income, Schufa report, confirmation of no rent arrears, tenant self-disclosure, the deposit. You do not deal with any of it alone.
We stay with it until the contract is signed and the keys are in your hand.
Location
The map shows where this apartment is. Where the exact house number has not been published we show the centre of the postcode instead, and say so.
Am Hellweg 4a, 33014 Bad Driburg, Bad Driburg
We help you get this apartment
Leave your details and one of our advisers will contact you shortly. We take it from there: the owner, the viewing, the contract and the paperwork.