White WBS for 3 persons up to 75 m²: Südvorstadt! 3-room apartment 74.72 m² with balcony, ecological 'wood house'! White WBS for 3 persons up to 75 m²: Südvorstadt! 3-room apartment 74.72 m² with balcony, ecological 'wood house'! White WBS for 3 persons up to 75 m²: Südvorstadt! 3-room apartment 74.72 m² with balcony, ecological 'wood house'! White WBS for 3 persons up to 75 m²: Südvorstadt! 3-room apartment 74.72 m² with balcony, ecological 'wood house'! White WBS for 3 persons up to 75 m²: Südvorstadt! 3-room apartment 74.72 m² with balcony, ecological 'wood house'!

White WBS for 3 persons up to 75 m²: Südvorstadt! 3-room apartment 74.72 m² with balcony, ecological 'wood house'!

Südvorstadt, Leipzig

Cold rent
€ 486
Warm rent € 725
Request this apartment

Description

Dear prospective tenants,

an exemplary project is being developed in the popular Inner South:

Ecological wooden construction combined with rent-controlled housing!

The whole is designed with high architectural standards, with further highlights:
- low energy costs through KfW 55 construction standard
- provision of carsharing vehicles, mostly electric (operated by TeilAuto/ Cityflitzer)
- CoWorking space in the building (rooms of 21 m², 14 m², 14 m² and 10 m²) available for occasional rental
- local supply in the building or just around the corner.

The rental of all 76 apartments (except for two apartments) is exclusively to holders of a white Wohnberechtigungsschein (WBS)!

About 34% of Leipzig’s population is entitled to a white Wohnberechtigungsschein. Usually, students and trainees are also included. They are very welcome as tenants!

IMPORTANT: As landlords, we decide to whom we want to offer a rental contract. There is no automatic right that every interested tenant with a white WBS will get an apartment. We select our tenants very carefully. We ask for your understanding in advance.

About the concept of the building:
The surfaces should, as far as possible, remain in the material they are built from. This mainly concerns the walls and ceilings in the apartments. Here, the surfaces have been left as visible wood to the greatest extent possible. This creates an incomparable, natural room climate. The wood surfaces also regulate humidity.

The solid wood exterior walls (up to 24 cm thick) also provide incomparable thermal insulation. The KfW 55 energy efficiency standard is achieved.

The surfaces in the stairwells are also largely left untreated, i.e., they present a "cool concrete look." This makes them less susceptible to dirt: dirt is much more noticeable on white walls than on concrete surfaces. The walking surfaces on the stairs and balconies remain uncovered. Thus, the 'rough common areas' form an appealing contrast to the rather warm and cozy living spaces.

The first occupancy should be possible from 01.10.2026 if everything goes perfectly. However, we still cannot guarantee this; it may also be 01 November!

Each apartment has partly very generous balconies.

A colorful mix of apartment sizes is being created:
From several 1-room apartments to a large number of

Contact the landlord now

Leave your details and one of our advisers will contact you shortly. We take it from there: the owner, the viewing, the contract and the paperwork.

By clicking »Send enquiry« I agree that the details I entered are collected and processed in order to handle my enquiry. They are used for nothing else and passed on only as described in the privacy policy. The data is deleted once the enquiry has been dealt with, and you may withdraw this consent at any time by email to info@rentroomgermany.com.

To send this message, you need an account.

Details

Living space
75 m²
Rooms
3
Floor
Floor 6
Service charges
€ 149
Deposit
€ 1,457
Available from
1 November 2026
Year built
2026
Published
3 September 2026
Features
Balcony or terrace, Cellar, Lift, Parking space, Pets allowed

Location

Alfred-Kästner-Straße 64-66, 04275 Leipzig, Südvorstadt

What prospective tenants say

All reviews on Trustportal
White WBS for 3 persons up to 75 m²: Südvorstadt! 3-room apartment 74.72 m² with balcony, ecological 'wood house'!